Maintenance & Service

To obtain maximum longevity of your product, we recommend our clients to conduct relevant cleaning, maintenance and service on the product - Below you will find an overview of the recommended cleaning, maintenance and service for the Zirocco-M.

Daily

Remarks

App. every 10 Hours

Every 100 Hours

Clean the wheels

Remove bitumen or other sticking materials

Replace the Air Filters if needed

Service check at ATT

Clean the Cyclone Filter

If cleaned with water, then dry before mounting

Check the wheel locks

 

Clean the Nozzle Cover

Remove bitumen or other sticking materials

Clean the engine cover plate

 

Dust off and clean the Zirocco

Remove dust and dirt incl. bitumen leftovers.

Check the Air Filters

Replace if dirty or showing signs of tear

 

 

Check fuel level in the display

Refuel if necessary in a plastic cannister)

 

 

At the 100 hour Service Check (only the Turbine module box, which is a 25 kg box module) ATT dismantle, clean, service and test all components. Thus, it has to be performed at our factory and lead time is app. 15 days from arrival. However, we offer 2 types of service check.

Recommended for off season service

Standard service check – price 1100 € 
The turbine module box will be serviced at arrival and returned after app. 15 days.

Recommended for service during operational periods.

Replacement and extended warranty of 1 year (max. 100 hours) – price 3000 € 
ATT ship a fully serviced turbine module box to the client, which he can install and keep. The client then sends his turbine to ATT (max 5 data from receiving the replacement turbine).
Additionally 1 year warranty (max 100 hours) is included on the delivered turbine module box. 
This can require a deposit of 5000 Euro, which will be refunded as soon as ATT has received the original turbine module box and conducted the service without any repairs.